Provider: UniSA Research Data Access Portal Content:text/plain; charset="utf-8" TY - DATA Y2 - 2024-11-24 PY - 2019 AU - Pezzaniti, D AU - Myers, B TI - Hydrological modelling of the Parafield wetlands for hazard analysis planning dataset UR - https://researchoutputs.unisa.edu.au/11541.1/b6338bc995c84b5faaff7d79db2b58d7 PB - University of South Australia LA - English KW - Water Resources Engineering (FOR-08) KW - Water Recycling Services (incl. Sewage and Greywater) (SEO-08) KW - Water KW - Catchment KW - Pollutant spills RI - -34.762584, 138.618702;-34.806334, 138.728962 RI - Parafield catchment, the City of Salisbury C1 - From 4/01/2011 12:00:00 AM C1 - To 20/12/2011 12:00:00 AM AB - As part of this project, a hazard analysis was conducted of the Parafield catchment located in the City of Salisbury, South Australia, where an established managed aquifer recharge project exists. It identified areas where hazards exist in the catchment of the scheme. This dataset includes a calibrated model of the Parafield catchment which was used to examine the travel time of pollutant spills from hazardous locations to the catchment end point. The model was developed in PCSWMM Version 5, available from CHI Software. However, the model is fully compatible with the USEPA Stormwater Management Model (SWMM) Version 5. Further information on the intent, assumptions and background data for the model is provided in the research report for the project, Refer to replated publication. This study was supported by The Goyder Institute for Water Research. ER -