Hydrological modelling of the Parafield wetlands for hazard analysis planning dataset
Published:
30 August 2019
As part of this project, a hazard analysis was conducted of the Parafield catchment located in the City of Salisbury, South Australia, where an established managed aquifer recharge project exists. It identified areas where hazards exist in the catchment of the scheme. This dataset includes a calibrated model of the Parafield catchment which was used to examine the travel time of pollutant spills from hazardous locations to the catchment end point. The model was developed in PCSWMM Version 5, available from CHI Software. However, the model is fully compatible with the USEPA Stormwater Management Model (SWMM) Version 5.
Further information on the intent, assumptions and background data for the model is provided in the research report for the project, Refer to replated publication.
This study was supported by The Goyder Institute for Water Research.
Data and resources
Other resources collected by the researchers may be available subject to researcher approval. Please contact Dr Baden Myers.
Period covered by the dataset
Start date: |
04 Jan 2011
|
End date: |
20 Dec 2011
|
Access rights
Requires researcher approval
Research collaborators
-
Senior Research Engineer, Centre for Water Management and Reuse
The dataset is researched by the related person
Data citation
Pezzaniti, D, Myers, B 2019, Hydrological modelling of the Parafield wetlands for hazard analysis planning dataset, University of South Australia, viewed 21 November 2024, retrieved from <https://researchoutputs.unisa.edu.au/11541.1/b6338bc995c84b5faaff7d79db2b58d7>.